Zwaanswyk High School Solar Project

Project overview

29 July 2025
  • Tractor Outdoor has a 3m x 6m digital screen on this site.
  • The screen has a battery backed UPS to cater for load shedding.
  • A 33kW grid tied solar system was installed to provide power to the digital screen, charge the batteries and provide the school with the excess power produced for their own consumption.
  • The Solar installation took 7 days.
  • The system is monitored and controlled remotely.

Solar panel installation

The results after the first three weeks of operation are as follows:
The solar system produced 1913kWh
The digital screen consumed 1110kWh
The school was provided with 803kWh
The solar system provides the school with approximately 30% of it’s total energy requirement.